Master / Slave

The master specifies a defined size which the slave follows.

Example: Synchronisation of Eddy current displacement measurement systems.
Operating several Eddy current measurement channels with a close distance to one another might cause a mutual influence due to slightly different oscillator frequencies. This can be prevented by synchronising the oscillators. For this reason, the controllers are connected together using a synchronisation cable. In the case of connection, the oscillator of controller 2 (slave) switches automatically to synchronisation mode and operates in dependence of controller 1 (master).
Trade shows
Subscribe now to our measurement newsletter
Trade shows

ME USA Headquarter

919 787 9707
919 787 9706
Find contact person
Mastercard and VISA accepted Express payment with
Visa or Mastercard
8120 Brownleigh Dr. Raleigh, NC 27617 mobile phone icon
919 787 9707 phone icon
919 787 9706 fax icon