Glossary

Master / Slave

The master specifies a defined size which the slave follows.

Example: Synchronisation of Eddy current displacement measurement systems.
Operating several Eddy current measurement channels with a close distance to one another might cause a mutual influence due to slightly different oscillator frequencies. This can be prevented by synchronising the oscillators. For this reason, the controllers are connected together using a synchronisation cable. In the case of connection, the oscillator of controller 2 (slave) switches automatically to synchronisation mode and operates in dependence of controller 1 (master).
Downloads
Trade shows
Subscribe now to our measurement newsletter
Trade shows
Contact

ME USA Headquarter

919 787 9707
919 787 9706
me-usa@micro-epsilon.com
Find contact person
Mastercard and VISA accepted Express payment with
Visa or Mastercard
 
HEADQUARTER MICRO-EPSILON AMERICA
8120 Brownleigh Dr. Raleigh, NC 27617
me-usa@micro-epsilon.com mobile phone icon
919 787 9707 phone icon
919 787 9706 fax icon